Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address NEW:
1440 S CRAYCROFT RD
Apply Date:
02/06/2025
Applicant:
Jason Stubblefield
Description:
Place porta potties and Fence to demo site. Fence and sidewalk to connect to existing.Installing sidewalk from building to existing sidewalk through ROW will not impact traffic.

Permit Reviews

Permit Number - TR-ROW-0225-00178
Permit Status: Inspections
Permit Description: Place porta potties and Fence to demo site. Fence and sidewalk to connect to existing.Installing sidewalk from building to existing sidewalk through ROW will not impact traffic.
Start Date Submittal Complete Date Status  
10/20/2026 RIGHT-OF-WAY REVIEW v.3 10/22/2026 APPROVED Review Details
02/07/2025 RIGHT-OF-WAY REVIEW v.1 02/13/2025 REQUIRES RESUBMIT Review Details
10/14/2026 RIGHT-OF-WAY REVIEW v.2 10/19/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0225-00178
Permit Status: Inspections
Permit Description: Place porta potties and Fence to demo site. Fence and sidewalk to connect to existing.Installing sidewalk from building to existing sidewalk through ROW will not impact traffic.
Total Outstanding Activity Conditions - 4
Date Name
02/11/2025 PRE-CON/PAVEMENT/SIDEWALK
02/11/2025 SIDEWALK INSTALLATION
02/11/2025 Traffic control set-up approved between 9AM - 3:30PM
10/22/2026 Swan Rd is under holiday restriction from the week of Thanksgiving through January 2. No work requiring barricades in the ROW shall occur within the restricted limits during this period

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0225-00178
Permit Description: Place porta potties and Fence to demo site. Fence and sidewalk to connect to existing.Installing sidewalk from building to existing sidewalk through ROW will not impact traffic.
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/03/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed pre-reactivity meeting held the previous day by Jeff. Concrete pour will commence once ground dries out and soil is re-compacted estimated Wednesday, November 4, 2026.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DESIGN PLAN-SITE-PLAN-REVISED-04-14-25-F1_V1.PDF DOCUMENTS VIEW
_O17VIYUDDYBDKTONNBSVLXS-WB7TMKXJ56BY6FBSCVEZNCQXHETYAOGGM16BJIMFG1S_U9QNV7J4UI1Y1ENYW.PDF DOCUMENTS VIEW
TCP KNIGHTS INN ROW PERMIT_V1.PDF DOCUMENTS VIEW
2025-01-08_KI_MINOR-DP-RESUBMITTAL_V1.PDF DOCUMENTS VIEW
CONS-2024-11-08_COT_KI_SECURITYUPGRADES_100SET-SEALED_V1 (5)_V1.PDF DOCUMENTS VIEW
PAGSTDDTL-200_ SIDEWALK.PDF DOCUMENTS VIEW