Permit: TR-ROW-0224-00201
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4111 S RAEMISCH WY
Address NEW:
4111 S RAEMISCH WY
Apply Date:
02/26/2024
Applicant:
Cameron Bonner
Description:
323056 Site 2 - Install Approximately 372 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and bench rehab's will be completed on MH 6169-05 and MH 6169-04 per PCRWRD standard detail 211.
Permit Reviews
Permit Number - TR-ROW-0224-00201
Permit Status: Complete
Permit Description: 323056 Site 2 - Install Approximately 372 LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. New concrete collars and bench rehab's will be completed on MH 6169-05 and MH 6169-04 per PCRWRD standard detail 211.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/26/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0224-00201
Permit Status: Complete
Permit Description: 323056 Site 2 - Install Approximately 372 LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. New concrete collars and bench rehab's will be completed on MH 6169-05 and MH 6169-04 per PCRWRD standard detail 211.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/26/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 02/26/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0224-00201
Permite Description: 323056 Site 2 - Install Approximately 372 LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. New concrete collars and bench rehab's will be completed on MH 6169-05 and MH 6169-04 per PCRWRD standard detail 211.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | site completed |
| 06/04/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | site completed no density reports provided. |
| 06/04/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Re-inspection required | site completed |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0224-00201
Permit Description: 323056 Site 2 - Install Approximately 372 LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. New concrete collars and bench rehab's will be completed on MH 6169-05 and MH 6169-04 per PCRWRD standard detail 211.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/04/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 06/04/2024 | TRSP - ROW - Notice of Completion | Passed | ||
| 06/04/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 02/20/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is already been completed, permit is expired, and a final inspection was passed by Travis in June 2024. | |
| 02/20/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is already been completed, permit is expired, and a final inspection was passed by Travis in June 2024. | |
| 02/20/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Work is already been completed, permit is expired, and a final inspection was passed by Travis in June 2024. |