Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
02/23/2024
Applicant:
Branden Davenport
Description:
We are removing the curb gutter and replacing it. We are also removing the AC sidewalk and replacing it. Request update 7/9/2024: Renewal request for 30 days as of 7/4/2024.

Permit Reviews

Permit Number - TR-ROW-0224-00194
Permit Status: Complete
Permit Description: We are removing the curb gutter and replacing it. We are also removing the AC sidewalk and replacing it. Request update 7/9/2024: Renewal request for 30 days as of 7/4/2024.
Start Date Submittal Complete Date Status  
03/05/2024 RIGHT-OF-WAY REVIEW v.2 03/08/2024 REQUIRES RESUBMIT Review Details
02/23/2024 RIGHT-OF-WAY REVIEW v.1 02/27/2024 REQUIRES RESUBMIT Review Details
05/31/2024 RIGHT-OF-WAY REVIEW v.3 05/31/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0224-00194
Permit Status: Complete
Permit Description: We are removing the curb gutter and replacing it. We are also removing the AC sidewalk and replacing it. Request update 7/9/2024: Renewal request for 30 days as of 7/4/2024.
Total Outstanding Activity Conditions - 2
Date Name
02/23/2024 WASH
02/23/2024 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ROW-0224-00194
Permite Description: We are removing the curb gutter and replacing it. We are also removing the AC sidewalk and replacing it. Request update 7/9/2024: Renewal request for 30 days as of 7/4/2024.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
07/08/2024 TRSP - ROW - Paving - Subgrade/removal/placement N/A Re-inspection required asphalt not completed site active renewal needed
07/08/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Re-inspection required bell had precon prior to retirement. I am requiring density testing for driveway.
07/08/2024 TRSP - ROW - Barricade Takedown N/A Re-inspection required barricades set up
07/08/2024 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
07/08/2024 TRSP - ROW - Final/Close-Out N/A Re-inspection required site active needs renewal
07/08/2024 TRSP - ROW - Concrete - Acceptance (Post-Pour) N/A Re-inspection required concrete has yet to be placed
07/08/2024 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0224-00194
Permit Description: We are removing the curb gutter and replacing it. We are also removing the AC sidewalk and replacing it. Request update 7/9/2024: Renewal request for 30 days as of 7/4/2024.
Total Completed Inspections - 10

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
0014 PHASING MAP_V1.PDF DOCUMENTS VIEW
0014 PLANS_V2.PDF DOCUMENTS VIEW
DREXEL RD - CIVANO BLVD EB CHANNEL_V1.PDF DOCUMENTS VIEW