Permit: TR-ROW-0224-00183
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
7471 S HOUGHTON RD
Address NEW:
7471 S HOUGHTON RD
Apply Date:
02/20/2024
Applicant:
ANGEL MORALES
Description:
Install new sewer line trench 5’W X 15’L X 10’D. ***
Permit Reviews
Permit Number - TR-ROW-0224-00183
Permit Status: Complete
Permit Description: Install new sewer line trench 5’W X 15’L X 10’D. ***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/21/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/28/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0224-00183
Permit Status: Complete
Permit Description: Install new sewer line trench 5’W X 15’L X 10’D. ***
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/21/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/21/2024 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 02/21/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0224-00183
Permite Description: Install new sewer line trench 5’W X 15’L X 10’D. ***
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Partial Pass | |
| 04/09/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required | contractor to renew permit. panels to be replaced once site is near completion. |
| 04/09/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | N/A | Re-inspection required | contractor to renew permit. panels to be replaced once site is near completion. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0224-00183
Permit Description: Install new sewer line trench 5’W X 15’L X 10’D. ***
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 03/13/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/18/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 03/18/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/05/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/30/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/30/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | no concrete needed |