Permit: TR-ROW-0224-00178
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1010 W MIRACLE MILE
Address NEW:
1010 W MIRACLE MILE
Apply Date:
02/19/2024
Applicant:
ANGEL MORALES
Description:
Water Line tie in on Fairview Ave, Driveway and Sidewalk Improvements. 80' Of excavation.
Permit Reviews
Permit Number - TR-ROW-0224-00178
Permit Status: Complete
Permit Description: Water Line tie in on Fairview Ave, Driveway and Sidewalk Improvements. 80' Of excavation.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/19/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/20/2024 | REQUIRES RESUBMIT |
| 02/21/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/12/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0224-00178
Permit Status: Complete
Permit Description: Water Line tie in on Fairview Ave, Driveway and Sidewalk Improvements. 80' Of excavation.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/21/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/21/2024 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 02/21/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
| 03/01/2024 | Arterial Road Closure -Emergency Response |
| 03/01/2024 | Public Notification |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0224-00178
Permit Description: Water Line tie in on Fairview Ave, Driveway and Sidewalk Improvements. 80' Of excavation.
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/25/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/26/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 05/07/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 05/10/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 05/16/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/17/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 08/04/2025 | TRSP - ROW - Final/Close-Out | Passed |