Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0224-00177
Permit Details
Apply Date:
02/16/2024
Applicant:
Sophie Gibson Rush
Description:
The 39th Annual Tucson Folk Festival has outdoor stages on Jacome Plaza, North Church Ave north of Alameda, in Presidio San Agustin Museum, North Court Ave south of Washington, and Telles east of Meyer Ave. Church from Pennington to Alameda closes Friday April 5. Church from Alameda to Washington closes Saturday April 6. Pennington from Church to Stone closes Saturday April 6. Alameda eastbound closes Saturday April 6 from Maine to Church. Telles closes Saturday April 6 from Meyer to Court. All five closures reopen by 5:30 am on Monday April 8. Traffic control setup and take down times: Friday April 5 at 6 AM, Saturday April 6 at 5 AM, Takedown Monday April 8 by 5:30 AM
Permit Reviews
Permit Number - TR-ROW-0224-00177
Permit Status: Complete
Permit Description: The 39th Annual Tucson Folk Festival has outdoor stages on Jacome Plaza, North Church Ave north of Alameda, in Presidio San Agustin Museum, North Court Ave south of Washington, and Telles east of Meyer Ave. Church from Pennington to Alameda closes Friday April 5. Church from Alameda to Washington closes Saturday April 6. Pennington from Church to Stone closes Saturday April 6. Alameda eastbound closes Saturday April 6 from Maine to Church. Telles closes Saturday April 6 from Meyer to Court. All five closures reopen by 5:30 am on Monday April 8.
Traffic control setup and take down times:
Friday April 5 at 6 AM, Saturday April 6 at 5 AM, Takedown Monday April 8 by 5:30 AM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/26/2024 | RIGHT-OF-WAY SIMPLE REVIEW v.3 | 03/27/2024 | APPROVED |
02/16/2024 | RIGHT-OF-WAY SIMPLE REVIEW v.1 | 02/28/2024 | REQUIRES RESUBMIT |
03/11/2024 | RIGHT-OF-WAY SIMPLE REVIEW v.2 | 03/19/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TR-ROW-0224-00177
Permit Status: Complete
Permit Description: The 39th Annual Tucson Folk Festival has outdoor stages on Jacome Plaza, North Church Ave north of Alameda, in Presidio San Agustin Museum, North Court Ave south of Washington, and Telles east of Meyer Ave. Church from Pennington to Alameda closes Friday April 5. Church from Alameda to Washington closes Saturday April 6. Pennington from Church to Stone closes Saturday April 6. Alameda eastbound closes Saturday April 6 from Maine to Church. Telles closes Saturday April 6 from Meyer to Court. All five closures reopen by 5:30 am on Monday April 8.
Traffic control setup and take down times:
Friday April 5 at 6 AM, Saturday April 6 at 5 AM, Takedown Monday April 8 by 5:30 AM
Date | Description | Comments |
---|---|---|
02/21/2024 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. | |
02/21/2024 | Traffic/Mobility Control Plan (MCP) approved as submitted. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0224-00177
Permit Description: The 39th Annual Tucson Folk Festival has outdoor stages on Jacome Plaza, North Church Ave north of Alameda, in Presidio San Agustin Museum, North Court Ave south of Washington, and Telles east of Meyer Ave. Church from Pennington to Alameda closes Friday April 5. Church from Alameda to Washington closes Saturday April 6. Pennington from Church to Stone closes Saturday April 6. Alameda eastbound closes Saturday April 6 from Maine to Church. Telles closes Saturday April 6 from Meyer to Court. All five closures reopen by 5:30 am on Monday April 8.
Traffic control setup and take down times:
Friday April 5 at 6 AM, Saturday April 6 at 5 AM, Takedown Monday April 8 by 5:30 AM
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/08/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
04/07/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed |