Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
104 N VINE AV
Apply Date:
02/15/2024
Applicant:
John Gruber
Description:
Emergency work. Temporary fix completed on 2/2/24 (no ground disturbance). Permanent fix will require us to saw cut approx 6’X4’ section of asphalt and use excavator to expose shifted tap connection on sewer main. Make necessary repair. Backfill area with proper soil. Tamp and compact ground to grade. Repair section of asphalt that was saw cut with hot patch.

Permit Reviews

Permit Number - TR-ROW-0224-00172
Permit Status: Complete
Permit Description: Emergency work. Temporary fix completed on 2/2/24 (no ground disturbance). Permanent fix will require us to saw cut approx 6’X4’ section of asphalt and use excavator to expose shifted tap connection on sewer main. Make necessary repair. Backfill area with proper soil. Tamp and compact ground to grade. Repair section of asphalt that was saw cut with hot patch.
Start Date Submittal Complete Date Status  
02/16/2024 RIGHT-OF-WAY REVIEW v.1 02/16/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0224-00172
Permit Status: Complete
Permit Description: Emergency work. Temporary fix completed on 2/2/24 (no ground disturbance). Permanent fix will require us to saw cut approx 6’X4’ section of asphalt and use excavator to expose shifted tap connection on sewer main. Make necessary repair. Backfill area with proper soil. Tamp and compact ground to grade. Repair section of asphalt that was saw cut with hot patch.
Total Outstanding Activity Conditions - 2
Date Name
02/16/2024 Emergency – After the fact
02/16/2024 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0224-00172
Permit Description: Emergency work. Temporary fix completed on 2/2/24 (no ground disturbance). Permanent fix will require us to saw cut approx 6’X4’ section of asphalt and use excavator to expose shifted tap connection on sewer main. Make necessary repair. Backfill area with proper soil. Tamp and compact ground to grade. Repair section of asphalt that was saw cut with hot patch.
Total Completed Inspections - 3
Date Description Inspector Results Comments
03/20/2024 TRSP - ROW - Paving - Subgrade/removal/placement Passed
03/20/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
03/20/2024 TRSP - ROW - Final/Close-Out Passed