Permit: TR-ROW-0224-00155
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
6930 E CAMINO BOLEADORAS
Address NEW:
6930 E CAMINO BOLEADORAS
Apply Date:
02/13/2024
Applicant:
Andrew Ruiz
Description:
Repairing Sidewalk Panels and Curbs along south side of Camino Boleadoras From Wilmot road to Kolb Road
Permit Reviews
Permit Number - TR-ROW-0224-00155
Permit Status: Complete
Permit Description: Repairing Sidewalk Panels and Curbs along south side of Camino Boleadoras From Wilmot road to Kolb Road
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/14/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/14/2024 | APPROVED |
Conditions
Permit Number - TR-ROW-0224-00155
Permit Status: Complete
Permit Description: Repairing Sidewalk Panels and Curbs along south side of Camino Boleadoras From Wilmot road to Kolb Road
| Date | Description | Comments |
|---|---|---|
| 02/14/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 02/14/2024 | Sidewalk installation | |
| 02/14/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0224-00155
Permite Description: Repairing Sidewalk Panels and Curbs along south side of Camino Boleadoras From Wilmot road to Kolb Road
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Re-inspection required | site not checked prior to pour |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0224-00155
Permit Description: Repairing Sidewalk Panels and Curbs along south side of Camino Boleadoras From Wilmot road to Kolb Road
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/04/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | inspected by Rick olson | |
| 05/01/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 05/01/2024 | TRSP - ROW - Final/Close-Out | Passed | work has been completed | |
| 05/01/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed |