Permit: TR-ROW-0224-00140
Permit Details
Apply Date:
02/08/2024
Applicant:
Armando Bracamonte
Description:
EMERGENCY, DONE AFTER THE FACT. - The contractor will be replacing damaged pole signal that was hit by motorist for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians. (Emergency, Done after the fact).
Permit Reviews
Permit Number - TR-ROW-0224-00140
Permit Status: Complete
Permit Description: EMERGENCY, DONE AFTER THE FACT. - The contractor will be replacing damaged pole signal that was hit by motorist for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians. (Emergency, Done after the fact).
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/08/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/08/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0224-00140
Permit Status: Complete
Permit Description: EMERGENCY, DONE AFTER THE FACT. - The contractor will be replacing damaged pole signal that was hit by motorist for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians. (Emergency, Done after the fact).
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/08/2024 | Emergency – After the fact permit – a MCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Contractor to address since DTM did not have an opportunity to review, approve or inspect work. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0224-00140
Permit Description: EMERGENCY, DONE AFTER THE FACT. - The contractor will be replacing damaged pole signal that was hit by motorist for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians. (Emergency, Done after the fact).
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/15/2024 | TRSP - ROW - Final/Close-Out | Passed |