Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Apply Date:
02/05/2024
Applicant:
Description:
Contractor excavating for Electric/Gas/Cable joint utility trench on E Wingate Blvd in the ROW for new subdivision Bella Tierra Phase 3.

Permit Reviews

Permit Number - TR-ROW-0224-00126
Permit Status: Issued
Permit Description: Contractor excavating for Electric/Gas/Cable joint utility trench on E Wingate Blvd in the ROW for new subdivision Bella Tierra Phase 3.
Start Date Submittal Complete Date Status  
02/06/2024 RIGHT-OF-WAY REVIEW v.1 02/07/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0224-00126
Permit Status: Issued
Permit Description: Contractor excavating for Electric/Gas/Cable joint utility trench on E Wingate Blvd in the ROW for new subdivision Bella Tierra Phase 3.
Total Outstanding Activity Conditions - 4
Date Name
02/06/2024 The following extended traffic control set-up times were approved: 24 Hr
02/06/2024 Traffic Control set-up approved between 7AM - 5PM
11/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Issued
Permit Number: TR-ROW-0224-00126
Permite Description: Contractor excavating for Electric/Gas/Cable joint utility trench on E Wingate Blvd in the ROW for new subdivision Bella Tierra Phase 3.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
05/17/2024 TRSP - ROW - Barricade - Setup/Routine N/A Complete (Recurring) work in progress
05/17/2024 TRSP - ROW - Paving - Subgrade/removal/placement N/A Complete (Recurring) work in progress with pia will reach out to Brian to renew permit
05/17/2024 TRSP - ROW - Barricade Takedown N/A Complete (Recurring) work in progress
05/17/2024 TRSP - ROW - Backfill - Placement/Compaction N/A Complete (Recurring) work in orogress
05/17/2024 TRSP - ROW - Final/Close-Out N/A Complete (Recurring) work in origress

Completed Inspections

Permit Status: Issued
Permit Number: TR-ROW-0224-00126
Permit Description: Contractor excavating for Electric/Gas/Cable joint utility trench on E Wingate Blvd in the ROW for new subdivision Bella Tierra Phase 3.
Total Completed Inspections - 1
Date Description Inspector Results Comments
05/17/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
CONSTRUCTION DRAWING_WR6344773_-00-4 (SIGNED BY SC)_V1.PDF DOCUMENTS VIEW
TRAFFIC CONTROL - BELLA_V1.PDF DOCUMENTS VIEW