Description:
Contractor excavating for Electric/Gas/Cable joint utility trench on E Wingate Blvd in the ROW for new subdivision Bella Tierra Phase 3.

Permit Reviews

Permit Number - TR-ROW-0224-00126
Permit Status: Complete
Permit Description: Contractor excavating for Electric/Gas/Cable joint utility trench on E Wingate Blvd in the ROW for new subdivision Bella Tierra Phase 3.
Start Date Submittal Complete Date Status  
02/06/2024 RIGHT-OF-WAY REVIEW v.1 02/07/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0224-00126
Permit Status: Complete
Permit Description: Contractor excavating for Electric/Gas/Cable joint utility trench on E Wingate Blvd in the ROW for new subdivision Bella Tierra Phase 3.
Total Outstanding Activity Conditions - 4
Date Name
02/06/2024 The following extended traffic control set-up times were approved: 24 Hr
02/06/2024 Traffic Control set-up approved between 7AM - 5PM
11/22/2023 THIS DOES NOT APPLY
11/22/2023 THIS DOES NOT APPLY

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ROW-0224-00126
Permite Description: Contractor excavating for Electric/Gas/Cable joint utility trench on E Wingate Blvd in the ROW for new subdivision Bella Tierra Phase 3.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
05/17/2024 TRSP - ROW - Barricade - Setup/Routine N/A Complete (Recurring) work in progress
05/17/2024 TRSP - ROW - Paving - Subgrade/removal/placement N/A Complete (Recurring) work in progress with pia will reach out to Brian to renew permit
05/17/2024 TRSP - ROW - Barricade Takedown N/A Complete (Recurring) work in progress
05/17/2024 TRSP - ROW - Backfill - Placement/Compaction N/A Complete (Recurring) work in orogress
05/17/2024 TRSP - ROW - Final/Close-Out N/A Complete (Recurring) work in origress

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0224-00126
Permit Description: Contractor excavating for Electric/Gas/Cable joint utility trench on E Wingate Blvd in the ROW for new subdivision Bella Tierra Phase 3.
Total Completed Inspections - 6
Date Description Inspector Results Comments
05/17/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
02/21/2025 TRSP - ROW - Barricade - Setup/Routine Passed The work on this permit has been completed, this permit is now expired, and this inspection is no longer needed.
02/21/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed Work on this permit has been completed, this permit is now expired, and the pavement patch appears to be within spec.
02/21/2025 TRSP - ROW - Barricade Takedown Passed Traffic control has been removed from jobsite
02/21/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work on this permit is complete, this permit is now expired, and this inspection is no longer needed.
02/21/2025 TRSP - ROW - Final/Close-Out Passed Work is completed and permit is expired