Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
1230 E SPEEDWAY BL
Apply Date:
02/20/2023
Applicant:
Ramiro Corella
Description:
CORE construction will be replacing windows on u of a capala building for the university of Arizona. It will be a 2-day project. they want to do it on spring break. between March 6th- March 10th.

Permit Reviews

Permit Number - TR-ROW-0223-00406
Permit Status: Complete
Permit Description: CORE construction will be replacing windows on u of a capala building for the university of Arizona. It will be a 2-day project. they want to do it on spring break. between March 6th- March 10th.
Start Date Submittal Complete Date Status  
02/28/2023 RIGHT-OF-WAY REVIEW v.1 02/28/2023 APPROVED Review Details

Conditions

Permit Number - TR-ROW-0223-00406
Permit Status: Complete
Permit Description: CORE construction will be replacing windows on u of a capala building for the university of Arizona. It will be a 2-day project. they want to do it on spring break. between March 6th- March 10th.
Date Description Comments
02/28/2023 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
02/28/2023 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0223-00406
Permit Description: CORE construction will be replacing windows on u of a capala building for the university of Arizona. It will be a 2-day project. they want to do it on spring break. between March 6th- March 10th.
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/13/2023 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
CORE 1230 E SPEEDWAY BLVD_TCP APPROVED.PDF DOCUMENTS VIEW