Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
1217 S AVENIDA SIRIO
Apply Date:
02/16/2023
Applicant:
Cameron Bonner
Description:
Site 2 - Ellison-Mills will coordinated with Palo Verde H.S. during their spring break 3/20 to 3/24 for all work that will be in front of the high school. The work has also been coordinated with 22nd St. Baptist Church (Shawn Lippert 520-990-5292) Install Approximately 290LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars will be completed on MH's 5989-02 and MH 5989-01 per PCRWRD standard detail 211/212.

Permit Reviews

Permit Number - TR-ROW-0223-00394
Permit Status: Complete
Permit Description: Site 2 - Ellison-Mills will coordinated with Palo Verde H.S. during their spring break 3/20 to 3/24 for all work that will be in front of the high school. The work has also been coordinated with 22nd St. Baptist Church (Shawn Lippert 520-990-5292) Install Approximately 290LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars will be completed on MH's 5989-02 and MH 5989-01 per PCRWRD standard detail 211/212.
Start Date Submittal Complete Date Status  
03/05/2023 RIGHT-OF-WAY REVIEW v.1 03/09/2023 APPROVED Review Details

Conditions

Permit Number - TR-ROW-0223-00394
Permit Status: Complete
Permit Description: Site 2 - Ellison-Mills will coordinated with Palo Verde H.S. during their spring break 3/20 to 3/24 for all work that will be in front of the high school. The work has also been coordinated with 22nd St. Baptist Church (Shawn Lippert 520-990-5292) Install Approximately 290LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars will be completed on MH's 5989-02 and MH 5989-01 per PCRWRD standard detail 211/212.
Date Description Comments
03/08/2023 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
03/08/2023 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ROW-0223-00394
Permite Description: Site 2 - Ellison-Mills will coordinated with Palo Verde H.S. during their spring break 3/20 to 3/24 for all work that will be in front of the high school. The work has also been coordinated with 22nd St. Baptist Church (Shawn Lippert 520-990-5292) Install Approximately 290LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars will be completed on MH's 5989-02 and MH 5989-01 per PCRWRD standard detail 211/212.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/30/2023 TRSP - ROW - Recurring N/A Complete (Recurring)

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0223-00394
Permit Description: Site 2 - Ellison-Mills will coordinated with Palo Verde H.S. during their spring break 3/20 to 3/24 for all work that will be in front of the high school. The work has also been coordinated with 22nd St. Baptist Church (Shawn Lippert 520-990-5292) Install Approximately 290LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars will be completed on MH's 5989-02 and MH 5989-01 per PCRWRD standard detail 211/212.
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/10/2023 TRSP - ROW - Notice of Completion Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
322033 - SITE 2 FMP MAP (1217 S AVENIDA SIRIO)_V1.PDF DOCUMENTS VIEW
DB 67416 - PAGE 2 - 1217 S AVENIDA SIRIO - SHOULDERS FOOTBALLS BUMPOUT - 322033_V1.PDF DOCUMENTS VIEW