Permit: TR-ROW-0223-00361
Permit Details
Apply Date:
02/09/2023
Applicant:
Description:
Site 1 - Install Approximately 286 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars will be completed on MH's 8464-01 and MH 8464-02 per PCRWRD standard detail 211/212.
Permit Reviews
Permit Number - TR-ROW-0223-00361
Permit Status: Complete
Permit Description: Site 1 - Install Approximately 286 LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. New concrete collars will
be completed on MH's 8464-01 and MH 8464-02 per PCRWRD standard
detail 211/212.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/13/2023 | RIGHT-OF-WAY REVIEW v.1 | 02/15/2023 | APPROVED |
Conditions
Permit Number - TR-ROW-0223-00361
Permit Status: Complete
Permit Description: Site 1 - Install Approximately 286 LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. New concrete collars will
be completed on MH's 8464-01 and MH 8464-02 per PCRWRD standard
detail 211/212.
| Date | Description | Comments |
|---|---|---|
| 02/15/2023 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
| 02/15/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0223-00361
Permit Description: Site 1 - Install Approximately 286 LF of 8" Cured in Place Pipe. The
Cured in Place Pipe is a trench-less technology for sewer rehabilitation
and does NOT require disturbance of the earth. New concrete collars will
be completed on MH's 8464-01 and MH 8464-02 per PCRWRD standard
detail 211/212.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2023 | TRSP - ROW - Final/Close-Out | Passed |