Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0126-00107
Permit Details
Status:
Approved
Type:
Right-of-Way (ROW)
Address:
3955 E BROADWAY BL
Address NEW:
3955 E BROADWAY BL
Apply Date:
01/27/2026
Applicant:
Description:
New Driveways for new structure- one driveway on Longfellow and One driveway on Broadway
Permit Reviews
Permit Number - TR-ROW-0126-00107
Permit Status: Approved
Permit Description: New Driveways for new structure- one driveway on Longfellow and One driveway on Broadway
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/28/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/02/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0126-00107
Permit Status: Approved
Permit Description: New Driveways for new structure- one driveway on Longfellow and One driveway on Broadway
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 01/30/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 01/30/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/30/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 02/02/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 02/02/2026 | Driveways to meet PAG standards and be Concrete Construction up to the back of Sidewalk.. |
| 02/02/2026 | The following extended traffic control set-up times were approved: |
| 02/02/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 02/02/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |