Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
1229 W ONTARIO ST
Apply Date:
01/26/2026
Applicant:
ALICIA OROZCO
Description:
1-30 YRD ROLL OFF TO BE DELIVERED ON 1/30 AND REMOVED ON 2/16 /WILL BE PLACED IN FRON OF HOME

Permit Reviews

Permit Number - TR-ROW-0126-00098
Permit Status: Complete
Permit Description: 1-30 YRD ROLL OFF TO BE DELIVERED ON 1/30 AND REMOVED ON 2/16 /WILL BE PLACED IN FRON OF HOME
Start Date Submittal Complete Date Status  
01/27/2026 RIGHT-OF-WAY REVIEW v.1 01/29/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0126-00098
Permit Status: Complete
Permit Description: 1-30 YRD ROLL OFF TO BE DELIVERED ON 1/30 AND REMOVED ON 2/16 /WILL BE PLACED IN FRON OF HOME
Total Outstanding Activity Conditions - 2
Date Name
01/29/2026 The following extended traffic control set-up times were approved:
01/29/2026 BARRICADES ARE REQUIRED AT ALL TIMES FOR ROLL OR PODS PLACED IN THE CITY R.O.W Roll-offs/dumpsters/pods 1. Roll-offs or Dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing storm drain infrastructure. 2. Roll-offs or Dumpsters shall keep lids on so that roll-off or dumpsters is kept covered when not in use. Plugs shall be kept in place. 3. Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4. Damaged containers shall be reported for replacement.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0126-00098
Permit Description: 1-30 YRD ROLL OFF TO BE DELIVERED ON 1/30 AND REMOVED ON 2/16 /WILL BE PLACED IN FRON OF HOME
Total Completed Inspections - 3
Date Description Inspector Results Comments
03/18/2026 TRSP - ROW - Barricade - Setup/Routine Passed
03/18/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
03/18/2026 TRSP - ROW - Final Passed