Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
7962 E BOOJUM ST
Address NEW:
7962 E BOOJUM ST
Apply Date:
01/25/2026
Applicant:
Ubaldo Martinez
Description:
Replace damaged sidewalk portions as noted in Code Violation Notice

Permit Reviews

Permit Number - TR-ROW-0126-00094
Permit Status: Complete
Permit Description: Replace damaged sidewalk portions as noted in Code Violation Notice
Start Date Submittal Complete Date Status  
01/26/2026 RIGHT-OF-WAY REVIEW v.1 01/27/2026 REQUIRES RESUBMIT Review Details
01/28/2026 RIGHT-OF-WAY REVIEW v.2 01/30/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0126-00094
Permit Status: Complete
Permit Description: Replace damaged sidewalk portions as noted in Code Violation Notice
Total Outstanding Activity Conditions - 2
Date Name
01/30/2026 Traffic Control set-up approved between 7AM - 5PM
01/30/2026 SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0126-00094
Permit Description: Replace damaged sidewalk portions as noted in Code Violation Notice
Total Completed Inspections - 5
Date Description Inspector Results Comments
03/06/2026 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete, traffic control followed the approved TCP
03/06/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work is complete
03/06/2026 TRSP - ROW - Final Passed Work is complete
03/06/2026 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed Work is complete
03/06/2026 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed Work is complete