Permit: TR-ROW-0126-00078
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
8205 S CAMINO DE CAFE
Address NEW:
8205 S CAMINO DE CAFE
Apply Date:
01/22/2026
Applicant:
Andrew Ruiz
Description:
8205 LOT 9- Remove existing sidewalk and pour contrete for driveway apron PAG SD 206
Permit Reviews
Permit Number - TR-ROW-0126-00078
Permit Status: Complete
Permit Description: 8205 LOT 9- Remove existing sidewalk and pour contrete for driveway apron PAG SD 206
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/26/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0126-00078
Permit Status: Complete
Permit Description: 8205 LOT 9- Remove existing sidewalk and pour contrete for driveway apron PAG SD 206
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 01/28/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/28/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 01/28/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 01/28/2026 | SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0126-00078
Permit Description: 8205 LOT 9- Remove existing sidewalk and pour contrete for driveway apron PAG SD 206
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/04/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with Jose from Sierra Land Surveying and Development over the phone and gave the green light to begin construction of the driveways. | |
| 02/13/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Site is ready for concrete | |
| 02/19/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | Work is complete | |
| 02/26/2026 | TRSP - ROW - Final | Passed | Work is complete |