Permit: TR-ROW-0126-00077
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
8219 S CAMINO DE CAFE
Address NEW:
8219 S CAMINO DE CAFE
Apply Date:
01/22/2026
Applicant:
Andrew Ruiz
Description:
8219 LOT 8- Remove existing sidewalk and pour contrete for driveway apron PAG SD 206
Permit Reviews
Permit Number - TR-ROW-0126-00077
Permit Status: Complete
Permit Description: 8219 LOT 8- Remove existing sidewalk and pour contrete for driveway apron PAG SD 206
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/26/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0126-00077
Permit Status: Complete
Permit Description: 8219 LOT 8- Remove existing sidewalk and pour contrete for driveway apron PAG SD 206
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 01/28/2026 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 01/28/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/28/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 01/28/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 01/28/2026 | SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0126-00077
Permit Description: 8219 LOT 8- Remove existing sidewalk and pour contrete for driveway apron PAG SD 206
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/04/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with Jose from Sierra Land Surveying and Development over the phone and gave the green light to begin construction of the driveways. | |
| 02/13/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Site is ready for concrete | |
| 02/13/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Traffic control is set up according to an approved TCP | |
| 02/19/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | Work is complete | |
| 02/26/2026 | TRSP - ROW - Final | Passed | Work is complete |