Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
321 W PASTIME RD
Address NEW:
321 W PASTIME RD
Apply Date:
01/20/2026
Applicant:
Description:
New water lines will be installed into the property.

Permit Reviews

Permit Number - TR-ROW-0126-00059
Permit Status: Complete
Permit Description: New water lines will be installed into the property.
Start Date Submittal Complete Date Status  
01/20/2026 RIGHT-OF-WAY REVIEW v.1 01/21/2026 REQUIRES RESUBMIT Review Details
01/21/2026 RIGHT-OF-WAY REVIEW v.2 01/22/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0126-00059
Permit Status: Complete
Permit Description: New water lines will be installed into the property.
Total Outstanding Activity Conditions - 3
Date Name
01/21/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
01/21/2026 PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
01/21/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0126-00059
Permit Description: New water lines will be installed into the property.
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/04/2026 TRSP - ROW - Barricade - Setup/Routine Passed Inspection not needed worked under an emergency and all work was completed, and then the F11 came through and covered up evidence
03/04/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Inspection not needed worked under an emergency and all work was completed, and then the 411 came through and covered up evidence all looks to be correct preactivity was held under previous permit
03/04/2026 TRSP - ROW - Backfill - Placement/Compaction Passed Inspection not needed worked under an emergency and all work was completed, and then the 411 came through and covered up evidence all looks to be correct
03/04/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
321 W PASTIME RD_V1.PDF DOCUMENTS VIEW
3_PASTIME FLATS DP_V1.PDF DOCUMENTS VIEW