Permit: TR-ROW-0126-00045
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW)
Address:
2695 N CRAYCROFT RD
Address NEW:
2695 N CRAYCROFT RD
Apply Date:
01/16/2026
Applicant:
Andrew Ruiz
Description:
NEW 4 INCH SEWER LINE FOR TMC CAMPUS AT 5462 EAST GLENN ST, TOTAL INSTALLATION 145FT.***
Permit Reviews
Permit Number - TR-ROW-0126-00045
Permit Status: Fees due
Permit Description: NEW 4 INCH SEWER LINE FOR TMC CAMPUS AT 5462 EAST GLENN ST, TOTAL INSTALLATION 145FT.***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/26/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0126-00045
Permit Status: Fees due
Permit Description: NEW 4 INCH SEWER LINE FOR TMC CAMPUS AT 5462 EAST GLENN ST, TOTAL INSTALLATION 145FT.***
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 01/20/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 01/20/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/21/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 01/21/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. jose.garcia@tucsonaz.gov Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 01/21/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 01/21/2026 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/21/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |