Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address NEW:
7667 E SPEEDWAY BL
Apply Date:
01/14/2026
Applicant:
German Arvizu
Description:
Sidewalk repair

Permit Reviews

Permit Number - TR-ROW-0126-00031
Permit Status: Inspections
Permit Description: Sidewalk repair
Start Date Submittal Complete Date Status  
01/14/2026 RIGHT-OF-WAY REVIEW v.1 01/15/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0126-00031
Permit Status: Inspections
Permit Description: Sidewalk repair
Total Outstanding Activity Conditions - 6
Date Name
01/14/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination.
01/15/2026 The following extended traffic control set-up times were approved:
01/15/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
01/15/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
01/15/2026 Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
01/15/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0126-00031
Permit Description: Sidewalk repair
Total Completed Inspections - 1
Date Description Inspector Results Comments
01/16/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
NOTICE OF VIOLATION SPEEDWAY_V1.PDF DOCUMENTS VIEW
SPEEDWAY SP_V1.PDF DOCUMENTS VIEW
SPEEDWAY TRAFFIC CONTROL PLAN_V1.PDF DOCUMENTS VIEW