Permit: TR-ROW-0126-00026
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
4055 S WINGATE BL
Address NEW:
4055 S WINGATE BL
Apply Date:
01/12/2026
Applicant:
Becky Hickox
Description:
Electric extension from street to new subdivision to the east extension will take no longer than 3 days to complete
Permit Reviews
Permit Number - TR-ROW-0126-00026
Permit Status: Inspections
Permit Description: Electric extension from street to new subdivision to the east
extension will take no longer than 3 days to complete
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/13/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/16/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0126-00026
Permit Status: Inspections
Permit Description: Electric extension from street to new subdivision to the east
extension will take no longer than 3 days to complete
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/13/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 01/13/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0126-00026
Permit Description: Electric extension from street to new subdivision to the east
extension will take no longer than 3 days to complete
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Spoke with Geoff Ruffell from Arizona Underground over the phone. Work will begin in one to two weeks max. 100% AB backfill with solid patches until Wingate gets widened and overlayed. |