Permit: TR-ROW-0126-00025
Permit Details
Apply Date:
01/12/2026
Applicant:
Becky Hickox
Description:
(2) Water extensions from street to new subdivision to the east -each extension will occur at different times -each extension will take no longer than 3 days to complete
Permit Reviews
Permit Number - TR-ROW-0126-00025
Permit Status: Complete
Permit Description: (2) Water extensions from street to new subdivision to the east
-each extension will occur at different times
-each extension will take no longer than 3 days to complete
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/13/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/22/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0126-00025
Permit Status: Complete
Permit Description: (2) Water extensions from street to new subdivision to the east
-each extension will occur at different times
-each extension will take no longer than 3 days to complete
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/15/2026 | The following extended traffic control set-up times were approved: |
| 01/15/2026 | PRE-CON/SIDEWALK |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0126-00025
Permite Description: (2) Water extensions from street to new subdivision to the east
-each extension will occur at different times
-each extension will take no longer than 3 days to complete
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/06/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Deferred |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0126-00025
Permit Description: (2) Water extensions from street to new subdivision to the east
-each extension will occur at different times
-each extension will take no longer than 3 days to complete
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | trench backfilled and compacted, roadway patched, approved | |
| 04/23/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | traffic control with flaggers observed on 4/20, job complete and traffic control devices removed | |
| 04/23/2026 | TRSP - ROW - Final | Passed | all backfill and roadwork completed, traffic control devices removed, job complete |