Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1002 S ALAMO AV
Address NEW:
1002 S ALAMO AV
Apply Date:
01/09/2026
Applicant:
Lucy Inzunza
Description:
Potholing for Tucson Water Project Phase 2

Permit Reviews

Permit Number - TR-ROW-0126-00020
Permit Status: Complete
Permit Description: Potholing for Tucson Water Project Phase 2
Start Date Submittal Complete Date Status  
01/16/2026 RIGHT-OF-WAY REVIEW v.2 01/16/2026 APPROVED Review Details
01/09/2026 RIGHT-OF-WAY REVIEW v.1 01/15/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0126-00020
Permit Status: Complete
Permit Description: Potholing for Tucson Water Project Phase 2
Total Outstanding Activity Conditions - 4
Date Name
01/16/2026 Traffic Control set-up approved between 7AM - 5PM
01/16/2026 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
01/16/2026 Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
01/16/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0126-00020
Permit Description: Potholing for Tucson Water Project Phase 2
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/08/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/22/2026 TRSP - ROW - Barricade - Setup/Routine Passed
07/22/2026 TRSP - ROW - Paving - Subgrade/removal/placement Passed
07/22/2026 TRSP - ROW - Final Passed