Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
812 E SPEEDWAY BL
Apply Date:
01/05/2026
Applicant:
Lisa Bowers
Description:
Alley closure to run electrical primaries to the building

Permit Reviews

Permit Number - TR-ROW-0126-00005
Permit Status: Complete
Permit Description: Alley closure to run electrical primaries to the building
Start Date Submittal Complete Date Status  
01/05/2026 RIGHT-OF-WAY REVIEW v.1 01/12/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0126-00005
Permit Status: Complete
Permit Description: Alley closure to run electrical primaries to the building
Total Outstanding Activity Conditions - 3
Date Name
01/07/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
01/07/2026 Traffic control set-up approved between 9AM - 3:30PM
01/07/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0126-00005
Permit Description: Alley closure to run electrical primaries to the building
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/12/2026 TRSP - ROW - Barricade - Setup/Routine Passed
02/12/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
02/13/2026 TRSP - ROW - Final Passed