Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0125-00152
Permit Details
Apply Date:
01/31/2025
Applicant:
Andrew Ruiz
Description:
Convert overhead electrical to underground on Columbus Blvd and Tappen Dr, total excavation 90’ 24hrs Site Adress:6154 S Columbus Blvd***
Permit Reviews
Permit Number - TR-ROW-0125-00152
Permit Status: Inspections
Permit Description: Convert overhead electrical to underground on Columbus Blvd and Tappen Dr, total excavation 90’
24hrs
Site Adress:6154 S Columbus Blvd***
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/05/2025 | RIGHT-OF-WAY REVIEW v.2 | 02/07/2025 | APPROVED |
01/31/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/04/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00152
Permit Status: Inspections
Permit Description: Convert overhead electrical to underground on Columbus Blvd and Tappen Dr, total excavation 90’
24hrs
Site Adress:6154 S Columbus Blvd***
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
02/03/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
02/03/2025 | Traffic Control set-up approved between 7AM - 5PM |
02/06/2025 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0125-00152
Permit Description: Convert overhead electrical to underground on Columbus Blvd and Tappen Dr, total excavation 90’
24hrs
Site Adress:6154 S Columbus Blvd***
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/11/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Todd, anticipating job to start later in March, request for permanent extension to be submitted. Informed Todd about sequence of inspections |