Permit: TR-ROW-0125-00149
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1510 E UNIVERSITY BL
Address NEW:
1510 E UNIVERSITY BL
Apply Date:
01/31/2025
Applicant:
ANGEL MORALES
Description:
Cipp Lining sewer Line
Permit Reviews
Permit Number - TR-ROW-0125-00149
Permit Status: Complete
Permit Description: Cipp Lining sewer Line
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/31/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/05/2025 | APPROVED |
| 02/20/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 02/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00149
Permit Status: Complete
Permit Description: Cipp Lining sewer Line
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/03/2025 | The following extended traffic control set-up times were approved: 8pm - 5 am setup. with approved TNE.. |
| 02/03/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 02/03/2025 | Proposed work falls with in City of Tucson and University of Arizona jurisdictional area, additional permits or approval maybe required by University of Arizona prior to start of work. Approval of this permit is for work within City of Tucson DTM Right of Way ONLY |
| 02/03/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/03/2025 | Approved Temporary Noise Exemption required prior to Night work being performed within the City of Tucson Right of Way.. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0125-00149
Permit Description: Cipp Lining sewer Line
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/26/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/26/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 02/26/2025 | TRSP - ROW - Final | Passed |