Permit: TR-ROW-0125-00146
Permit Details
Apply Date:
01/30/2025
Applicant:
Adam Bishop
Description:
Abandonment of approximately 1,500ft of 3" steel water main and relocation of 5 water meters, including private plumbing, permits, asphalt and curb replacement, and coordination with property owners.
Permit Reviews
Permit Number - TR-ROW-0125-00146
Permit Status: Fees paid
Permit Description: Abandonment of approximately 1,500ft of 3" steel water main and relocation of 5 water meters, including private plumbing, permits, asphalt and curb replacement, and coordination with property owners.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/31/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/05/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00146
Permit Status: Fees paid
Permit Description: Abandonment of approximately 1,500ft of 3" steel water main and relocation of 5 water meters, including private plumbing, permits, asphalt and curb replacement, and coordination with property owners.
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
02/03/2025 | Traffic Control set-up approved between 7AM - 5PM |
02/04/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
02/04/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL |
02/04/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
02/04/2025 | Tucson Unified School District - Sewell Elementary School. Notification and Coordination with school administration staff to be made prior to start of work, to avoid Traffic disruption of school drop off and pick up operations |
02/04/2025 | Traffic control set-up approved between 9AM - 3:30PM |
02/04/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |