Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
1648 S SAN ANTONIO DR
Apply Date:
01/30/2025
Applicant:
contractor
Description:
we will dig in the right of way between the curb and the property.

Permit Reviews

Permit Number - TR-ROW-0125-00144
Permit Status: Complete
Permit Description: we will dig in the right of way between the curb and the property.
Start Date Submittal Complete Date Status  
01/30/2025 RIGHT-OF-WAY REVIEW v.1 02/04/2025 REQUIRES RESUBMIT Review Details
02/06/2025 RIGHT-OF-WAY REVIEW v.2 02/07/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0125-00144
Permit Status: Complete
Permit Description: we will dig in the right of way between the curb and the property.
Total Outstanding Activity Conditions - 3
Date Name
02/07/2025 Traffic Control set-up approved between 7AM - 5PM
02/07/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
02/07/2025 Pre-activity meeting to be held 72 hours in advance of work start with inspections. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0125-00144
Permit Description: we will dig in the right of way between the curb and the property.
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/14/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
03/14/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
03/14/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PDF_V2.PDF DOCUMENTS VIEW