Permit: TR-ROW-0125-00141
Permit Details
Apply Date:
01/29/2025
Applicant:
Andrew Ruiz
Description:
Installation of new sewer line for new apartment building and other utilities (Approved For Sewer Work Only, Each Utility installation required separate ROW permit)
Permit Reviews
Permit Number - TR-ROW-0125-00141
Permit Status: Issued
Permit Description: Installation of new sewer line for new apartment building and other utilities (Approved For Sewer Work Only, Each Utility installation required separate ROW permit)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/30/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00141
Permit Status: Issued
Permit Description: Installation of new sewer line for new apartment building and other utilities (Approved For Sewer Work Only, Each Utility installation required separate ROW permit)
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
01/31/2025 | Traffic control set-up approved between 9AM - 3:30PM |
01/31/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
02/03/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
02/03/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
02/03/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |