Permit: TR-ROW-0125-00117
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2726 N MOUNTAIN VIEW AV
Address NEW:
2726 N MOUNTAIN VIEW AV
Apply Date:
01/24/2025
Applicant:
Brian Reitmeyer
Description:
Curb cut, installation of new driveway apron, and removing and replacing damaged sidewalk.Work includes curb cut, removal of damaged sidewalk, installation of driveway apron per PAG STD DTL 206, and replacement of the sidewalk per PAG STD DTL 200. Impacts to traffic will be negligible.
Permit Reviews
Permit Number - TR-ROW-0125-00117
Permit Status: Complete
Permit Description: Curb cut, installation of new driveway apron, and removing and replacing damaged sidewalk.Work includes curb cut, removal of damaged sidewalk, installation of driveway apron per PAG STD DTL 206, and replacement of the sidewalk per PAG STD DTL 200. Impacts to traffic will be negligible.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/27/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 01/28/2025 | REQUIRES RESUBMIT |
| 01/29/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 01/30/2025 | APPROVED |
| 01/28/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 01/28/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00117
Permit Status: Complete
Permit Description: Curb cut, installation of new driveway apron, and removing and replacing damaged sidewalk.Work includes curb cut, removal of damaged sidewalk, installation of driveway apron per PAG STD DTL 206, and replacement of the sidewalk per PAG STD DTL 200. Impacts to traffic will be negligible.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 01/28/2025 | DRIVEWAY |
| 01/28/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 01/28/2025 | SIDEWALK |
| 01/28/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0125-00117
Permit Description: Curb cut, installation of new driveway apron, and removing and replacing damaged sidewalk.Work includes curb cut, removal of damaged sidewalk, installation of driveway apron per PAG STD DTL 206, and replacement of the sidewalk per PAG STD DTL 200. Impacts to traffic will be negligible.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/03/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 03/24/2025 | TRSP - ROW - Final | Passed |