Permit: TR-ROW-0125-00106
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
10155 E GOLF LINKS RD
Address NEW:
10155 E GOLF LINKS RD
Apply Date:
01/23/2025
Applicant:
Caitlin Ripley
Description:
potholing for design and discovery of utilities
Permit Reviews
Permit Number - TR-ROW-0125-00106
Permit Status: Complete
Permit Description: potholing for design and discovery of utilities
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/05/2025 | RIGHT-OF-WAY REVIEW v.2 | 02/07/2025 | APPROVED |
| 01/24/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/30/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00106
Permit Status: Complete
Permit Description: potholing for design and discovery of utilities
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/27/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 01/27/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/30/2025 | LEMAN ACADEMY OF EXCELLENCE INC - Work area located in proximity to school, Notification and Coordination with school staff prior to start of work required to limit traffic impact at start and end of school. Proof of Notification at time of Pre-Activity meeting |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0125-00106
Permit Description: potholing for design and discovery of utilities
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with David and had a pre-construction meeting with him over the phone. He stated that work would probably begin in a week or more because of how backed up their schedule was. | |
| 03/13/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete, but no traffic control set up inspection was requested. | |
| 03/13/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete, but no backfill inspection was requested | |
| 03/13/2025 | TRSP - ROW - Final | Passed | Work is complete. All potholes were in dirt therefore, no sidewalk or pavement was impacted. |