Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0125-00083
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
244 E FAIRGROUND DR
Address NEW:
244 E FAIRGROUND DR
Apply Date:
01/16/2025
Applicant:
Logan Byers
Description:
E Fairground Dr.- Funded by City of Tucson Water mini grants program in collaboration with neighborhood community body. To install 2 back of curb rainwater basins. In Total: ~20 linear feet of Basin length.
Permit Reviews
Permit Number - TR-ROW-0125-00083
Permit Status: Complete
Permit Description: E Fairground Dr.- Funded by City of Tucson Water mini grants program in collaboration with neighborhood community body. To install 2 back of curb rainwater basins. In Total: ~20 linear feet of Basin length.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/17/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/30/2025 | REQUIRES RESUBMIT |
| 03/18/2025 | RIGHT-OF-WAY REVIEW v.2 | 03/19/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00083
Permit Status: Complete
Permit Description: E Fairground Dr.- Funded by City of Tucson Water mini grants program in collaboration with neighborhood community body. To install 2 back of curb rainwater basins. In Total: ~20 linear feet of Basin length.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/22/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 01/22/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0125-00083
Permit Description: E Fairground Dr.- Funded by City of Tucson Water mini grants program in collaboration with neighborhood community body. To install 2 back of curb rainwater basins. In Total: ~20 linear feet of Basin length.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/12/2025 | TRSP - ROW - SWBMP | Passed | ||
| 06/12/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/12/2025 | TRSP - ROW - Final | Passed |