Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0125-00058
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
7250 S TUCSON BL
Address NEW:
7250 S TUCSON BL
Apply Date:
01/10/2025
Applicant:
ANGEL MORALES
Description:
Equipment in Right of way all work on airport property-24HRS - ***
Permit Reviews
Permit Number - TR-ROW-0125-00058
Permit Status: Inspections
Permit Description: Equipment in Right of way all work on airport property-24HRS - ***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/10/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/14/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00058
Permit Status: Inspections
Permit Description: Equipment in Right of way all work on airport property-24HRS - ***
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/14/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 01/14/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0125-00058
Permite Description: Equipment in Right of way all work on airport property-24HRS - ***
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0125-00058
Permit Description: Equipment in Right of way all work on airport property-24HRS - ***
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/14/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |