Permit: TR-ROW-0125-00051
Permit Details
Apply Date:
01/09/2025
Applicant:
ANGEL MORALES
Description:
Access to sewer manhole to Maintenance and/or repair. Replace concrete manhole collars as needed. ( 2 Locations)
Permit Reviews
Permit Number - TR-ROW-0125-00051
Permit Status: Complete
Permit Description: Access to sewer manhole to Maintenance and/or repair. Replace concrete manhole collars as needed. ( 2 Locations)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2025 | RIGHT-OF-WAY REVIEW v.2 | 01/17/2025 | REQUIRES RESUBMIT |
| 01/09/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/14/2025 | REQUIRES RESUBMIT |
| 01/22/2025 | RIGHT-OF-WAY REVIEW v.3 | 01/22/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00051
Permit Status: Complete
Permit Description: Access to sewer manhole to Maintenance and/or repair. Replace concrete manhole collars as needed. ( 2 Locations)
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/13/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/13/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 01/22/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0125-00051
Permit Description: Access to sewer manhole to Maintenance and/or repair. Replace concrete manhole collars as needed. ( 2 Locations)
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 01/29/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/31/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 01/29/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 02/25/2025 | TRSP - ROW - Final | Passed |