Permit: TR-ROW-0125-00042
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1709 S CRAYCROFT RD
Address NEW:
1709 S CRAYCROFT RD
Apply Date:
01/08/2025
Applicant:
Dennis Caldwell
Description:
24 hour right lane CL on southbound Craycroft Rd north of 29th ST with 2 Rows of ADA wall and 2 ADA ramps inside the right lane CL for a pedestrian access in front of address.
Permit Reviews
Permit Number - TR-ROW-0125-00042
Permit Status: Complete
Permit Description: 24 hour right lane CL on southbound Craycroft Rd north of 29th ST with 2 Rows of ADA wall and 2 ADA ramps inside the right lane CL for a pedestrian access in front of address.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2025 | RIGHT-OF-WAY REVIEW v.3 | 02/21/2025 | APPROVED |
| 01/08/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/13/2025 | REQUIRES RESUBMIT |
| 01/17/2025 | RIGHT-OF-WAY REVIEW v.2 | 01/17/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00042
Permit Status: Complete
Permit Description: 24 hour right lane CL on southbound Craycroft Rd north of 29th ST with 2 Rows of ADA wall and 2 ADA ramps inside the right lane CL for a pedestrian access in front of address.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/10/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/10/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0125-00042
Permit Description: 24 hour right lane CL on southbound Craycroft Rd north of 29th ST with 2 Rows of ADA wall and 2 ADA ramps inside the right lane CL for a pedestrian access in front of address.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete, traffic control has already been removed | |
| 06/03/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work is complete, no pre-con was ever requested | |
| 06/03/2025 | TRSP - ROW - Barricade Takedown | Passed | Work is complete | |
| 06/03/2025 | TRSP - ROW - Final | Passed | Work is complete |