Permit: TR-ROW-0125-00035
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4101 N CAMPBELL AV
Address NEW:
4101 N CAMPBELL AV
Apply Date:
01/08/2025
Applicant:
ANGEL MORALES
Description:
Park Truck By Cell Tower for Cell Tower work.*** Work Site: 1805 E Roger
Permit Reviews
Permit Number - TR-ROW-0125-00035
Permit Status: Complete
Permit Description: Park Truck By Cell Tower for Cell Tower work.***
Work Site: 1805 E Roger
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/08/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/09/2025 | APPROVED |
| 02/19/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 02/20/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00035
Permit Status: Complete
Permit Description: Park Truck By Cell Tower for Cell Tower work.***
Work Site: 1805 E Roger
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/09/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 01/09/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/19/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0125-00035
Permit Description: Park Truck By Cell Tower for Cell Tower work.***
Work Site: 1805 E Roger
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/13/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/20/2025 | TRSP - ROW - Final | Passed |