Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0125-00027
Permit Details
Apply Date:
01/07/2025
Applicant:
Cordell Lee
Description:
Pantano Parkway - S Pantano Pkwy Funded by City of Tucson Water mini grants program. In collaboration with Ward 2 to install 8 rainwater basins alongside the S Pantano Pkwy street. In Total: ~421 linear feet of Basin length. **24 HOUR TCP REQUESTED**
Permit Reviews
Permit Number - TR-ROW-0125-00027
Permit Status: Complete
Permit Description: Pantano Parkway - S Pantano Pkwy
Funded by City of Tucson Water mini grants program.
In collaboration with Ward 2 to install 8 rainwater basins alongside the S Pantano Pkwy street.
In Total: ~421 linear feet of Basin length.
**24 HOUR TCP REQUESTED**
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/07/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/13/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00027
Permit Status: Complete
Permit Description: Pantano Parkway - S Pantano Pkwy
Funded by City of Tucson Water mini grants program.
In collaboration with Ward 2 to install 8 rainwater basins alongside the S Pantano Pkwy street.
In Total: ~421 linear feet of Basin length.
**24 HOUR TCP REQUESTED**
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/09/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 01/09/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0125-00027
Permit Description: Pantano Parkway - S Pantano Pkwy
Funded by City of Tucson Water mini grants program.
In collaboration with Ward 2 to install 8 rainwater basins alongside the S Pantano Pkwy street.
In Total: ~421 linear feet of Basin length.
**24 HOUR TCP REQUESTED**
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/24/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/27/2025 | TRSP - ROW - Final | Passed | ||
| 06/27/2025 | TRSP - ROW - Landscape Architect | Passed |