Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0125-00023
Permit Details
Apply Date:
01/07/2025
Applicant:
ANGEL MORALES
Description:
Park truck in lane for work on cell tower. ( Permit Updated to 24 hr right lane closure with ADA detour route placement, as of 2/13/2025) ***
Permit Reviews
Permit Number - TR-ROW-0125-00023
Permit Status: Complete
Permit Description: Park truck in lane for work on cell tower. ( Permit Updated to 24 hr right lane closure with ADA detour route placement, as of 2/13/2025)
***
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/07/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/08/2025 | REQUIRES RESUBMIT |
| 01/09/2025 | RIGHT-OF-WAY REVIEW v.2 | 01/09/2025 | APPROVED |
| 02/13/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 02/14/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0125-00023
Permit Status: Complete
Permit Description: Park truck in lane for work on cell tower. ( Permit Updated to 24 hr right lane closure with ADA detour route placement, as of 2/13/2025)
***
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 01/08/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 01/08/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/09/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
| 01/09/2025 | Proposed Project area is located in proximate to Tucson Unified School District school and may effect school traffic flow.. Contractor to make contact with TUSD school administration staff, and make notification of work, coordinate work hours to provide least impact on Traffic flow and school arrival and departure flows. |
| 02/13/2025 | The following extended traffic control set-up times were approved: 24hr Right lane closure with ADA detour route. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0125-00023
Permite Description: Park truck in lane for work on cell tower. ( Permit Updated to 24 hr right lane closure with ADA detour route placement, as of 2/13/2025)
***
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2025 | TRSP - ROW - Barricade - Setup/Routine | N/A | Partial Pass | |
| 02/13/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0125-00023
Permit Description: Park truck in lane for work on cell tower. ( Permit Updated to 24 hr right lane closure with ADA detour route placement, as of 2/13/2025)
***
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/18/2025 | TRSP - ROW - Final | Passed |