Permit: TR-ROW-0124-00057
Permit Details
Apply Date:
01/10/2024
Applicant:
Benjamin Lozano
Description:
Bore line installation of conduit infrastructure to facilitate installation of fiber optic cabling for Pima County Permit (1 of 5)
Permit Reviews
Permit Number - TR-ROW-0124-00057
Permit Status: Complete
Permit Description: Bore line installation of conduit infrastructure to facilitate installation of fiber optic cabling for Pima County Permit (1 of 5)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/10/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/11/2024 | REQUIRES RESUBMIT |
02/02/2024 | RIGHT-OF-WAY REVIEW v.4 | 02/05/2024 | APPROVED |
01/31/2024 | RIGHT-OF-WAY REVIEW v.3 | 02/01/2024 | REQUIRES RESUBMIT |
01/12/2024 | RIGHT-OF-WAY REVIEW v.2 | 01/31/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0124-00057
Permit Status: Complete
Permit Description: Bore line installation of conduit infrastructure to facilitate installation of fiber optic cabling for Pima County Permit (1 of 5)
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
01/10/2024 | BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
01/10/2024 | Traffic control set-up approved between 9AM - 3:30PM |
01/10/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0124-00057
Permit Description: Bore line installation of conduit infrastructure to facilitate installation of fiber optic cabling for Pima County Permit (1 of 5)
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/08/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
05/15/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
05/15/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
09/13/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | landscape areas restored, site complete | |
09/13/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | all barricades removed | |
09/17/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | no asphalt restoration needed, site complete |