Permit: TR-ROW-0124-00035
Permit Details
Apply Date:
01/05/2024
Applicant:
Description:
Please cross reference TR-ROW-1023-01259 (maximum number of extension already requested). Requesting for the South (Wieding Road) side only of the Development, to complete Asphalt for driveway connections to street.
Permit Reviews
Permit Number - TR-ROW-0124-00035
Permit Status: Complete
Permit Description: Please cross reference TR-ROW-1023-01259 (maximum number of extension already requested). Requesting for the South (Wieding Road) side only of the Development, to complete Asphalt for driveway connections to street.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/05/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/10/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0124-00035
Permit Status: Complete
Permit Description: Please cross reference TR-ROW-1023-01259 (maximum number of extension already requested). Requesting for the South (Wieding Road) side only of the Development, to complete Asphalt for driveway connections to street.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/08/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0124-00035
Permit Description: Please cross reference TR-ROW-1023-01259 (maximum number of extension already requested). Requesting for the South (Wieding Road) side only of the Development, to complete Asphalt for driveway connections to street.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/23/2024 | TRSP - ROW - SITE INSPECTION | Passed |