Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
01/23/2023
Applicant:
Brittany Bechtold
Description:
Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.

Permit Reviews

Permit Number - TR-ROW-0123-00287
Permit Status: Complete
Permit Description: Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
Start Date Submittal Complete Date Status  
01/26/2023 RIGHT-OF-WAY REVIEW v.1 02/08/2023 APPROVED Review Details

Conditions

Permit Number - TR-ROW-0123-00287
Permit Status: Complete
Permit Description: Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
Date Description Comments
02/03/2023 Sun Tran
02/03/2023 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0123-00287
Permit Description: Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
Total Completed Inspections - 2
Date Description Inspector Results Comments
02/21/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Contacted Alex Stack. Work will be started and completed February 28. Work will be no more than 45 minutes. Pulling manhole cover and checking depth of well, put the manhole cover back on and work will be complete. Traffic control only.
03/02/2023 TRSP - ROW - Final/Close-Out Passed Wells were inspected on February 28. No further issues.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW