Permit: TR-ROW-0123-00287
Permit Details
Apply Date:
01/23/2023
Applicant:
Brittany Bechtold
Description:
Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
Permit Reviews
Permit Number - TR-ROW-0123-00287
Permit Status: Complete
Permit Description: Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/26/2023 | RIGHT-OF-WAY REVIEW v.1 | 02/08/2023 | APPROVED |
Conditions
Permit Number - TR-ROW-0123-00287
Permit Status: Complete
Permit Description: Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
Date | Description | Comments |
---|---|---|
02/03/2023 | Sun Tran | |
02/03/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0123-00287
Permit Description: Sample two groundwater monitoring wells (2 hours). Work zones are in the Kino Parkway N/B exit ramp for the first well and Kino Pkwy S/B off-ramp for the other. Also, measure water level at a groundwater monitoring well (30 minutes) at the 1415 S Cherry Ave., Tucson, AZ 85713 address.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/21/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Contacted Alex Stack. Work will be started and completed February 28. Work will be no more than 45 minutes. Pulling manhole cover and checking depth of well, put the manhole cover back on and work will be complete. Traffic control only. | |
03/02/2023 | TRSP - ROW - Final/Close-Out | Passed | Wells were inspected on February 28. No further issues. |