Permit: TR-ROW-0123-00200
Permit Details
Apply Date:
01/03/2023
Applicant:
Eric Pisciotta
Description:
THROUGHLY CLEAN EXISTING LINE AND MH BENCHES, INSTALL NEW CONCRETE 1 212 COLLARS, AND CIPP LINING
Permit Reviews
Permit Number - TR-ROW-0123-00200
Permit Status: Complete
Permit Description: THROUGHLY CLEAN EXISTING LINE AND MH BENCHES, INSTALL NEW CONCRETE 1 212 COLLARS, AND CIPP LINING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/08/2023 | RIGHT-OF-WAY REVIEW v.1 | 01/19/2023 | APPROVED |
Conditions
Permit Number - TR-ROW-0123-00200
Permit Status: Complete
Permit Description: THROUGHLY CLEAN EXISTING LINE AND MH BENCHES, INSTALL NEW CONCRETE 1 212 COLLARS, AND CIPP LINING
| Date | Description | Comments |
|---|---|---|
| 02/14/2023 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. | |
| 01/19/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON-SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO HISTORIC PRESERVATION OFFICE, CITY OF TUCSON, P.O. BOX 27210, TUCSON, AZ 85726.** PLEASE CONTACT JODIE BROWN AT JODIE.BROWN@TUCSONAZ.GOV WITH ANY QUESTIONS. | |
| 01/19/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0123-00200
Permit Description: THROUGHLY CLEAN EXISTING LINE AND MH BENCHES, INSTALL NEW CONCRETE 1 212 COLLARS, AND CIPP LINING
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | We’re already completed, no pre-activity meeting held | |
| 10/07/2024 | TRSP - ROW - Final/Close-Out | Passed |