Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Approved
Type:
Private Improvement Agreement (PIA)
Apply Date:
09/17/2024
Applicant:
Andie Hemmah
Description:
Escalera Phase 2 (Residential)

Permit Reviews

Permit Number - TR-PIA-0924-00013
Permit Status: Approved
Permit Description: Escalera Phase 2 (Residential)
Start Date Submittal Complete Date Status  
02/10/2026 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 02/11/2026 APPROVED Review Details
12/17/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 02/04/2026 REQUIRES RESUBMIT Review Details
10/17/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 12/08/2025 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Approved
Permit Number: TR-PIA-0924-00013
Permite Description: Escalera Phase 2 (Residential)
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
TRSP - PIA - Drainage Structure N/A Scheduled
TRSP - PIA - Drainage - Pipe Installation/Removal N/A Scheduled
TRSP - PIA - Paving Inspection N/A Scheduled
TRSP – PIA – Underground Utility/Joint Trench N/A Scheduled
TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork N/A Scheduled
TRSP - PIA - Sidewalk Placement N/A Scheduled
TRSP - PIA - Barricade - Setup/Takedown/Routine N/A Scheduled
TRSP - PIA - AB Placement N/A Scheduled
TRSP - PIA - Roadway Subgrade N/A Scheduled

Scheduled Inspections

Scheduled Inspections - TR-PIA-0924-00013
Status: Approved
Description: Escalera Phase 2 (Residential)
Scheduled Date Description Entered By Entered Date
03/09/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Scheduled
03/09/2026 TRSP - PIA - Roadway Subgrade Scheduled
03/09/2026 TRSP - PIA - Drainage - Pipe Installation/Removal Scheduled
03/09/2026 TRSP – PIA – Underground Utility/Joint Trench Scheduled
03/09/2026 TRSP - PIA - Drainage Structure Scheduled
03/09/2026 TRSP - PIA - AB Placement Scheduled
03/09/2026 TRSP - PIA - Paving Inspection Scheduled
03/09/2026 TRSP - PIA - Curb Placement Scheduled
03/09/2026 TRSP - PIA - Sidewalk Placement Scheduled
03/09/2026 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
SUB3-LA ESCALERA PHASE 2 PIA_2-09-26_V3.PDF DOCUMENTS VIEW