Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Approved
Type:
Private Improvement Agreement (PIA)
Apply Date:
09/12/2024
Applicant:
Andie Hemmah
Description:
Paseo Gran Escalera Phases 2-4

Permit Reviews

Permit Number - TR-PIA-0924-00012
Permit Status: Approved
Permit Description: Paseo Gran Escalera Phases 2-4
Start Date Submittal Complete Date Status  
09/02/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 09/03/2025 APPROVED Review Details
06/23/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 08/13/2025 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Approved
Permit Number: TR-PIA-0924-00012
Permite Description: Paseo Gran Escalera Phases 2-4
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
TRSP – PIA – Underground Utility/Joint Trench N/A Scheduled
TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork N/A Scheduled
TRSP - PIA - AB Placement N/A Scheduled
TRSP - PIA - Barricade - Setup/Takedown/Routine N/A Scheduled
TRSP - PIA - Sidewalk Placement N/A Scheduled

Completed Inspections

Permit Status: Approved
Permit Number: TR-PIA-0924-00012
Permit Description: Paseo Gran Escalera Phases 2-4
Total Completed Inspections - 1
Date Description Inspector Results Comments
01/06/2026 TRSP - PIA - Roadway Subgrade Passed String lining was done on subgrade between stations 10+50 & 13+50. The paving design will be 3 inches of asphaltic concrete on 4 inches of roadway AB. All measurements were within specifications for this paving area.

Scheduled Inspections

Scheduled Inspections - TR-PIA-0924-00012
Status: Approved
Description: Paseo Gran Escalera Phases 2-4
Scheduled Date Description Entered By Entered Date
01/24/2026 TRSP - PIA - Roadway Subgrade Scheduled
01/24/2026 TRSP - PIA - Paving Inspection Scheduled
01/24/2026 TRSP - PIA - Drainage - Pipe Installation/Removal Scheduled
01/24/2026 TRSP - PIA - Sidewalk Placement Scheduled
01/24/2026 TRSP - PIA - AB Placement Scheduled
01/24/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Scheduled
01/24/2026 TRSP – PIA – Underground Utility/Joint Trench Scheduled
01/24/2026 TRSP - PIA - Curb Placement Scheduled
01/24/2026 TRSP - PIA - Drainage Structure Scheduled
01/24/2026 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
SUB2-PGE-PIA-REVISION1_8-29-25_V2.PDF DOCUMENTS VIEW
PLAN NO. I-2022-009.PDF DOCUMENTS VIEW