Permit: TR-PIA-0923-00026
Permit Details
Status:
Approved
Type:
Private Improvement Agreement (PIA)
Address:
5386 S NOGALES HY
Address NEW:
5386 S NOGALES HY
Apply Date:
09/28/2023
Applicant:
Corey Thompson
Description:
Offsite Paving Plans for Rodeo Addition No. 4 with new public roads Gallo Way & Ida Lane and private roads Ida Lane & Rosetta Court, includes new asphalt, ADA Ramps, Curb (both vertical and wedge) , Sidewalk, Scuppers, and drainage structures.
Permit Reviews
Permit Number - TR-PIA-0923-00026
Permit Status: Approved
Permit Description: Offsite Paving Plans for Rodeo Addition No. 4 with new public roads Gallo Way & Ida Lane and private roads Ida Lane & Rosetta Court, includes new asphalt, ADA Ramps, Curb (both vertical and wedge) , Sidewalk, Scuppers, and drainage structures.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/10/2024 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.4 | 04/24/2024 | REQUIRES RESUBMIT |
| 03/04/2025 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 | 05/27/2025 | REQUIRES RESUBMIT |
| 09/28/2023 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 | 10/27/2023 | REQUIRES RESUBMIT |
| 05/15/2025 | PRIVATE IMPROVEMENT AGREEMENT REVIEW REVISION v.1 | 06/13/2025 | APPROVED |
| 04/29/2024 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.5 | 04/29/2024 | APPROVED |
| 11/28/2023 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 | 01/04/2024 | REQUIRES RESUBMIT |
| 02/28/2024 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 | 04/02/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TR-PIA-0923-00026
Permit Status: Approved
Permit Description: Offsite Paving Plans for Rodeo Addition No. 4 with new public roads Gallo Way & Ida Lane and private roads Ida Lane & Rosetta Court, includes new asphalt, ADA Ramps, Curb (both vertical and wedge) , Sidewalk, Scuppers, and drainage structures.
| Date | Description | Comments |
|---|---|---|
| 03/04/2024 | ||
| 03/27/2024 |
Outstanding Inspections
Permit Status: Approved
Permit Number: TR-PIA-0923-00026
Permite Description: Offsite Paving Plans for Rodeo Addition No. 4 with new public roads Gallo Way & Ida Lane and private roads Ida Lane & Rosetta Court, includes new asphalt, ADA Ramps, Curb (both vertical and wedge) , Sidewalk, Scuppers, and drainage structures.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2024 | TRSP - PIA - Curb Placement | N/A | Partial Pass | Work Continuing daily. |
| 10/03/2024 | TRSP - PIA - Pre-Paving Meeting/Inspection | N/A | Not Ready | I was contacted by Scott Holmes and asked to reschedule compaction density tests as well as string lining due to a water leak discovered on site. In order to remediate the leak, the main street off of Nogales Hwy, Gallo Rd., has to be excavated. Therefore, tests have been rescheduled for Friday, October 4th and string lining for Monday, October 7th. |
| 10/04/2024 | TRSP - PIA - Roadway Subgrade | N/A | Partial Pass | |
| 10/14/2024 | TRSP - PIA - Drainage Structure | N/A | Canceled | Catchbasin on Nogales Hwy was formed and poured last week |
| 10/04/2024 | TRSP - PIA - Backfill - Placement/Compaction | N/A | Partial Pass | |
| 08/06/2025 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | N/A | Re-inspection required | Please see checklist comments for items to be addressed. Please have all equipment and material removed from RoW prior to final approval. |
Completed Inspections
Permit Status: Approved
Permit Number: TR-PIA-0923-00026
Permit Description: Offsite Paving Plans for Rodeo Addition No. 4 with new public roads Gallo Way & Ida Lane and private roads Ida Lane & Rosetta Court, includes new asphalt, ADA Ramps, Curb (both vertical and wedge) , Sidewalk, Scuppers, and drainage structures.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2024 | TRSP - PIA - Pre-Construction Meeting | Passed | ||
| 01/08/2025 | TRSP - PIA - Paving Inspection | Passed | See inspection report from old system | |
| 10/14/2024 | TRSP - PIA - Backfill - Placement/Compaction | Passed | ||
| 07/22/2025 | TRSP - PIA - Signage/Striping Final | Passed | Victor Atondo Traffic Engineering Technician | |
| 12/02/2025 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | Punchlist items complete and verified. |