Permit: TR-PIA-0426-00004
Permit Details
Status:
Issued
Type:
Private Improvement Agreement (PIA)
Address:
3430 E VALENCIA RD
Address NEW:
3430 E VALENCIA RD
Apply Date:
04/02/2026
Applicant:
Description:
The scope of work for the project varies for each frontage. Along Valencia, two 5'x5' passing panels were added to the existing sidewalk and a new driveway approach is proposed. Along Palo Verde Road, there is a proposed driveway approach as well as a 5' landscape strip prior to a 4' concrete sidewalk. Along Universal Way, there is a proposed 5' landscape strip prior to a 4' concrete sidewalk. And finally, along Brosius Ave, there is a proposed driveway approach as well as a 5' landscape strip prior to a 4' concrete sidewalk. Additionally, three frontage corners are being modified to include ADA compliant Ramps. The corner ramp at the intersection of Valencia and Brosius has been carefully modified to avoid negatively impacting the existing Spillway/ headwall in that location.
Permit Reviews
Permit Number - TR-PIA-0426-00004
Permit Status: Issued
Permit Description: The scope of work for the project varies for each frontage. Along Valencia, two 5'x5' passing panels were added to the existing sidewalk and a new driveway approach is proposed. Along Palo Verde Road, there is a proposed driveway approach as well as a 5' landscape strip prior to a 4' concrete sidewalk. Along Universal Way, there is a proposed 5' landscape strip prior to a 4' concrete sidewalk. And finally, along Brosius Ave, there is a proposed driveway approach as well as a 5' landscape strip prior to a 4' concrete sidewalk. Additionally, three frontage corners are being modified to include ADA compliant Ramps. The corner ramp at the intersection of Valencia and Brosius has been carefully modified to avoid negatively impacting the existing Spillway/ headwall in that location.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/01/2026 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 | 08/10/2026 | REQUIRES RESUBMIT |
| 04/09/2026 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 | 05/01/2026 | REQUIRES RESUBMIT |
| 08/10/2026 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 | 08/21/2026 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-PIA-0426-00004
Permite Description: The scope of work for the project varies for each frontage. Along Valencia, two 5'x5' passing panels were added to the existing sidewalk and a new driveway approach is proposed. Along Palo Verde Road, there is a proposed driveway approach as well as a 5' landscape strip prior to a 4' concrete sidewalk. Along Universal Way, there is a proposed 5' landscape strip prior to a 4' concrete sidewalk. And finally, along Brosius Ave, there is a proposed driveway approach as well as a 5' landscape strip prior to a 4' concrete sidewalk. Additionally, three frontage corners are being modified to include ADA compliant Ramps. The corner ramp at the intersection of Valencia and Brosius has been carefully modified to avoid negatively impacting the existing Spillway/ headwall in that location.
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| TRSP - PIA - Curb Placement | N/A | Scheduled | ||
| TRSP - PIA - Drainage Structure | N/A | Scheduled | ||
| TRSP - PIA - Drainage - Pipe Installation/Removal | N/A | Scheduled | ||
| TRSP - PIA - Paving Inspection | N/A | Scheduled | ||
| TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork | N/A | Scheduled | ||
| TRSP - PIA - Sidewalk Placement | N/A | Scheduled | ||
| TRSP - PIA - Barricade - Setup/Takedown/Routine | N/A | Scheduled | ||
| TRSP - PIA - AB Placement | N/A | Scheduled | ||
| TRSP - PIA - Roadway Subgrade | N/A | Scheduled |
Completed Inspections
Permit Status: Issued
Permit Number: TR-PIA-0426-00004
Permit Description: The scope of work for the project varies for each frontage. Along Valencia, two 5'x5' passing panels were added to the existing sidewalk and a new driveway approach is proposed. Along Palo Verde Road, there is a proposed driveway approach as well as a 5' landscape strip prior to a 4' concrete sidewalk. Along Universal Way, there is a proposed 5' landscape strip prior to a 4' concrete sidewalk. And finally, along Brosius Ave, there is a proposed driveway approach as well as a 5' landscape strip prior to a 4' concrete sidewalk. Additionally, three frontage corners are being modified to include ADA compliant Ramps. The corner ramp at the intersection of Valencia and Brosius has been carefully modified to avoid negatively impacting the existing Spillway/ headwall in that location.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2026 | TRSP - PIA - Pre-Construction Meeting | Passed |
Scheduled Inspections
Scheduled Inspections - TR-PIA-0426-00004
Status: Issued
Description: The scope of work for the project varies for each frontage. Along Valencia, two 5'x5' passing panels were added to the existing sidewalk and a new driveway approach is proposed. Along Palo Verde Road, there is a proposed driveway approach as well as a 5' landscape strip prior to a 4' concrete sidewalk. Along Universal Way, there is a proposed 5' landscape strip prior to a 4' concrete sidewalk. And finally, along Brosius Ave, there is a proposed driveway approach as well as a 5' landscape strip prior to a 4' concrete sidewalk. Additionally, three frontage corners are being modified to include ADA compliant Ramps. The corner ramp at the intersection of Valencia and Brosius has been carefully modified to avoid negatively impacting the existing Spillway/ headwall in that location.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 11/07/2026 | TRSP - PIA - AB Placement | Scheduled | |
| 11/07/2026 | TRSP - PIA - Paving Inspection | Scheduled | |
| 11/07/2026 | TRSP - PIA - Sidewalk Placement | Scheduled | |
| 11/07/2026 | TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork | Scheduled | |
| 11/07/2026 | TRSP - PIA - Drainage - Pipe Installation/Removal | Scheduled | |
| 11/07/2026 | TRSP - PIA - Curb Placement | Scheduled | |
| 11/07/2026 | TRSP - PIA - Roadway Subgrade | Scheduled | |
| 11/07/2026 | TRSP - PIA - Drainage Structure | Scheduled | |
| 11/07/2026 | TRSP - PIA - Barricade - Setup/Takedown/Routine | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.