Permit Details

Status:
Issued
Type:
Private Improvement Agreement (PIA)
Address:
480 E ELVADO RD
Address NEW:
480 E ELVADO RD
Apply Date:
04/16/2024
Applicant:
Colby Fryar
Description:
PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.

Permit Reviews

Permit Number - TR-PIA-0424-00007
Permit Status: Issued
Permit Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Start Date Submittal Complete Date Status  
11/20/2024 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 06/05/2025 REQUIRES RESUBMIT Review Details
04/17/2024 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 05/22/2024 REQUIRES RESUBMIT Review Details
06/05/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 06/10/2025 APPROVED Review Details

Conditions

Permit Number - TR-PIA-0424-00007
Permit Status: Issued
Permit Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Date Description Comments
05/08/2024

Outstanding Inspections

Permit Status: Issued
Permit Number: TR-PIA-0424-00007
Permite Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
06/26/2025 TRSP - PIA - Pre-Construction Meeting N/A Deferred
TRSP - PIA - Curb Placement N/A Scheduled
TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork N/A Scheduled
TRSP - PIA - Drainage - Pipe Installation/Removal N/A Scheduled
09/17/2025 TRSP - PIA - Paving Inspection N/A Re-inspection required The overall execution of the laying of the asphaltic concrete went well; however there is a section of approximately 135 feet between the first and second pass (or ribbons from a total of 3) on the south side of Elvado closest to the intersection with Geronimo where the seam is in really bad shape. The area will be evaluated according to the specifications and measured with a ten foot straight edge to evaluate its integrity. By sight test, it does not look like it will pass and will be on the contractor to come up with a repair. The total tonnage for this work was 408.
TRSP – PIA – Underground Utility/Joint Trench N/A Scheduled

Completed Inspections

Permit Status: Issued
Permit Number: TR-PIA-0424-00007
Permit Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/22/2025 TRSP - PIA - Paving Inspection Passed Random locations have been chosen to core samples and complete a Rice Asphalt test at the lab. The two station locations are 1+67 R 3 feet and 6+39 R 29 feet. An email request has been sent to the City of Tucson materials lab for the work to be done as soon as possible due to multiple issues already found in the asphalt due to workmanship.

Scheduled Inspections

Scheduled Inspections - TR-PIA-0424-00007
Status: Issued
Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Scheduled Date Description Entered By Entered Date
12/06/2025 TRSP - PIA - Paving Inspection Scheduled
12/06/2025 TRSP - PIA - Roadway Subgrade Scheduled
12/06/2025 TRSP - PIA - Drainage - Pipe Installation/Removal Scheduled
12/06/2025 TRSP - PIA - AB Placement Scheduled
12/06/2025 TRSP - PIA - Curb Placement Scheduled
12/06/2025 TRSP - PIA - Drainage Structure Scheduled
12/06/2025 TRSP - PIA - Curb Placement Scheduled
12/06/2025 TRSP – PIA – Underground Utility/Joint Trench Scheduled
12/06/2025 TRSP - PIA - Barricade - Setup/Takedown/Routine Scheduled
12/06/2025 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
5ELVSS_ELVADO STORMDRAIN PLANS_SEALED_V1.PDF DOCUMENTS VIEW