Description:
PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Permit Reviews
Permit Number - TR-PIA-0424-00007
Permit Status: Issued
Permit Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/20/2024 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 | 06/05/2025 | REQUIRES RESUBMIT |
| 04/17/2024 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 | 05/22/2024 | REQUIRES RESUBMIT |
| 06/05/2025 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 | 06/10/2025 | APPROVED |
Conditions
Permit Number - TR-PIA-0424-00007
Permit Status: Issued
Permit Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
| Date | Description | Comments |
|---|---|---|
| 05/08/2024 |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-PIA-0424-00007
Permite Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2025 | TRSP - PIA - Pre-Construction Meeting | N/A | Deferred | |
| TRSP - PIA - Curb Placement | N/A | Scheduled | ||
| TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork | N/A | Scheduled | ||
| TRSP - PIA - Drainage - Pipe Installation/Removal | N/A | Scheduled | ||
| 09/17/2025 | TRSP - PIA - Paving Inspection | N/A | Re-inspection required | The overall execution of the laying of the asphaltic concrete went well; however there is a section of approximately 135 feet between the first and second pass (or ribbons from a total of 3) on the south side of Elvado closest to the intersection with Geronimo where the seam is in really bad shape. The area will be evaluated according to the specifications and measured with a ten foot straight edge to evaluate its integrity. By sight test, it does not look like it will pass and will be on the contractor to come up with a repair. The total tonnage for this work was 408. |
| TRSP – PIA – Underground Utility/Joint Trench | N/A | Scheduled |
Completed Inspections
Permit Status: Issued
Permit Number: TR-PIA-0424-00007
Permit Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | TRSP - PIA - Paving Inspection | Passed | Random locations have been chosen to core samples and complete a Rice Asphalt test at the lab. The two station locations are 1+67 R 3 feet and 6+39 R 29 feet. An email request has been sent to the City of Tucson materials lab for the work to be done as soon as possible due to multiple issues already found in the asphalt due to workmanship. |
Scheduled Inspections
Scheduled Inspections - TR-PIA-0424-00007
Status: Issued
Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 12/06/2025 | TRSP - PIA - Paving Inspection | Scheduled | |
| 12/06/2025 | TRSP - PIA - Roadway Subgrade | Scheduled | |
| 12/06/2025 | TRSP - PIA - Drainage - Pipe Installation/Removal | Scheduled | |
| 12/06/2025 | TRSP - PIA - AB Placement | Scheduled | |
| 12/06/2025 | TRSP - PIA - Curb Placement | Scheduled | |
| 12/06/2025 | TRSP - PIA - Drainage Structure | Scheduled | |
| 12/06/2025 | TRSP - PIA - Curb Placement | Scheduled | |
| 12/06/2025 | TRSP – PIA – Underground Utility/Joint Trench | Scheduled | |
| 12/06/2025 | TRSP - PIA - Barricade - Setup/Takedown/Routine | Scheduled | |
| 12/06/2025 | TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork | Scheduled |