Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Private Improvement Agreement (PIA)
Address:
480 E ELVADO RD
Address NEW:
480 E ELVADO RD
Apply Date:
04/16/2024
Applicant:
Colby Fryar
Description:
PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.

Permit Reviews

Permit Number - TR-PIA-0424-00007
Permit Status: Issued
Permit Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Start Date Submittal Complete Date Status  
11/20/2024 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 06/05/2025 REQUIRES RESUBMIT Review Details
04/17/2024 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 05/22/2024 REQUIRES RESUBMIT Review Details
06/05/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 06/10/2025 APPROVED Review Details

Conditions

Permit Number - TR-PIA-0424-00007
Permit Status: Issued
Permit Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Date Description Comments
05/08/2024

Outstanding Inspections

Permit Status: Issued
Permit Number: TR-PIA-0424-00007
Permite Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
06/26/2025 TRSP - PIA - Pre-Construction Meeting N/A Deferred
TRSP - PIA - Curb Placement N/A Scheduled
TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork N/A Scheduled
TRSP - PIA - Barricade - Setup/Takedown/Routine N/A Scheduled
01/21/2026 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) N/A Re-inspection required Final punch list items need to be addressed and finalized.

Scheduled Inspections

Scheduled Inspections - TR-PIA-0424-00007
Status: Issued
Description: PC RFCD Elvado Road Storm Drain project - Phase 2: Nogales Highway to 6th Avenue, new twin 42" RCP run from new inlet on 475 E Elvado Rd north and East of Nogales Hwy to existing grate-style catch basin east of 6th Avenue, also includes two new grate-style catch basins west of Geronimo Avenue and another west of Nogales Hwy, with new curb at catch basins and asphalt.
Scheduled Date Description Entered By Entered Date
01/26/2026 TRSP - PIA - AB Placement Scheduled
01/26/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Scheduled
01/26/2026 TRSP - PIA - Drainage - Pipe Installation/Removal Scheduled
01/26/2026 TRSP - PIA - Drainage Structure Scheduled
01/26/2026 TRSP - PIA - Curb Placement Scheduled
01/26/2026 TRSP - PIA - Roadway Subgrade Scheduled
01/26/2026 TRSP - PIA - Curb Placement Scheduled
01/26/2026 TRSP - PIA - Paving Inspection Scheduled
01/26/2026 TRSP – PIA – Underground Utility/Joint Trench Scheduled
01/26/2026 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
5ELVSS_ELVADO STORMDRAIN PLANS_SEALED_V1.PDF DOCUMENTS VIEW