Permit Details

Status:
Fees Paid
Type:
Private Improvement Agreement (PIA)
Address NEW:
4055 S WINGATE BL
Apply Date:
03/18/2025
Applicant:
Becky Hickox
Description:
Public Paving plans for Bella Tierra Phase 4, Phase 3, Lots 54-200

Permit Reviews

Permit Number - TR-PIA-0325-00004
Permit Status: Fees paid
Permit Description: Public Paving plans for Bella Tierra Phase 4, Phase 3, Lots 54-200
Start Date Submittal Complete Date Status  
12/01/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 12/20/2025 APPROVED Review Details
07/28/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 08/20/2025 REQUIRES RESUBMIT Review Details
03/25/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 05/06/2025 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Fees Paid
Permit Number: TR-PIA-0325-00004
Permite Description: Public Paving plans for Bella Tierra Phase 4, Phase 3, Lots 54-200
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
TRSP - PIA - Drainage - Pipe Installation/Removal N/A Scheduled
TRSP - PIA - Paving Inspection N/A Scheduled
TRSP – PIA – Underground Utility/Joint Trench N/A Scheduled
TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork N/A Scheduled
TRSP - PIA - Sidewalk Placement N/A Scheduled
TRSP - PIA - Barricade - Setup/Takedown/Routine N/A Scheduled
TRSP - PIA - AB Placement N/A Scheduled
TRSP - PIA - Roadway Subgrade N/A Scheduled

Completed Inspections

Permit Status: Fees Paid
Permit Number: TR-PIA-0325-00004
Permit Description: Public Paving plans for Bella Tierra Phase 4, Phase 3, Lots 54-200
Total Completed Inspections - 1
Date Description Inspector Results Comments
10/22/2026 TRSP - PIA - Pre-Construction Meeting Passed Pre-Construction Meeting on site at Bella Tierra Ph 4 - This is the third phase of Bella Tierra Ph 4, and we have had a strong relationship and effective communication throughout the process thus far. Brant Williams is the main contact and owner of AZ Underground. Tony Ortiz is the super and foreman of the concrete crew with whom I have met and worked with multiple times over the course of Bella Tierra Ph 4. ISX has been the company used to pave during this process, and the contact I work with to work with ISX is Brant Williams.

Scheduled Inspections

Scheduled Inspections - TR-PIA-0325-00004
Status: Fees Paid
Description: Public Paving plans for Bella Tierra Phase 4, Phase 3, Lots 54-200
Scheduled Date Description Entered By Entered Date
11/12/2026 TRSP - PIA - AB Placement Scheduled
11/12/2026 TRSP - PIA - Sidewalk Placement Scheduled
11/12/2026 TRSP - PIA - Paving Inspection Scheduled
11/12/2026 TRSP - PIA - Curb Placement Scheduled
11/12/2026 TRSP - PIA - Drainage - Pipe Installation/Removal Scheduled
11/12/2026 TRSP - PIA - Drainage Structure Scheduled
11/12/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Scheduled
11/12/2026 TRSP - PIA - Roadway Subgrade Scheduled
11/12/2026 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Scheduled
11/12/2026 TRSP – PIA – Underground Utility/Joint Trench Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
3_5075A-_5075A BT4 PAVING PH3_V1.PDF DOCUMENTS VIEW
2_5075A BT4 PAVING PH3_V2.PDF DOCUMENTS VIEW
2_5075A BT4 PAVING PH3_V2_DTM COMMENTS.PDF DOCUMENTS VIEW