Permit: TR-FBR-1126-00067
Permit Details
Status:
Fees Paid
Type:
Fiber Permit
Address:
6651 E TANQUE VERDE RD
Address NEW:
6651 E TANQUE VERDE RD
Apply Date:
11/18/2026
Applicant:
Alex Abril
Description:
Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. Tanque Verde Rd Proofing_Pantano Rd to Grant Rd_Tucson
Permit Reviews
Permit Number - TR-FBR-1126-00067
Permit Status: Fees paid
Permit Description: Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. Tanque Verde Rd Proofing_Pantano Rd to Grant Rd_Tucson
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/19/2026 | RIGHT-OF-WAY SIMPLE REVIEW v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-FBR-1126-00067
Permit Status: Fees paid
Permit Description: Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days. Tanque Verde Rd Proofing_Pantano Rd to Grant Rd_Tucson
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 11/19/2026 | PRE-ACTIVITY/CONTRUCTION MEETING |
| 11/19/2026 | SIDEWALK |
| 11/19/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/19/2026 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |